Most small business websites take four to six weeks from kickoff to launch. Larger sites with many service and location pages take six to ten. Here is where that time actually goes, and what you can do to keep your project on schedule.
The Short Answer
| Project | Typical timeline |
|---|---|
| Simple 5-page site | 3 to 4 weeks |
| Service business, 10 to 15 pages | 4 to 6 weeks |
| Multi-location or membership site | 7 to 10 weeks |
| E-commerce or custom application | 10 weeks or more |
Week by Week
Week 1: discovery and planning
We learn the business, the customers and the competition, then map which page targets which search. This is also when photos, logins and existing content get collected.
Week 2: design
You see the homepage design and give feedback. Once the look is approved, the rest of the pages follow the same system.
Weeks 3 and 4: build and content
Pages get built, copy gets written and placed, forms get wired to your inbox or CRM, and tracking goes in.
Week 5: review and testing
Every page is checked on phones, tablets and desktops. Forms are tested end to end, because a form that looks fine but never sends is more common than you would think.
Week 6: launch
Redirects, sitemap, Search Console and analytics go live with the site, followed by a few weeks of monitoring.
What Slows Projects Down
- Waiting on content. The single biggest cause of delay. If you are writing the copy yourself, expect it to take longer than you think.
- Photos. Real photos of your team and work beat stock, but someone has to take them.
- Too many decision makers. Feedback rounds multiply when five people each have a vote.
- Scope that grows mid-project. New features are fine; they just move the date.
What Speeds Them Up
- One person who can approve decisions.
- Logins for your domain, hosting and Google accounts on day one.
- Letting the agency write the copy, then editing it rather than starting from a blank page.
- Agreeing on what is in phase one and what can wait for phase two.
Redesigns and Migrations
A redesign of an established site adds a step: mapping every old URL to its new home so you keep your rankings. It adds a few days, not weeks, and skipping it is how redesigns lose traffic. Our redesign guide explains the process, and our website redesign service handles it for you.
What to Prepare Before Kickoff
You can take a week or more off almost any project by gathering these before the first meeting:
- Logins for your domain registrar, hosting, Google Business Profile, Search Console and Analytics.
- Your logo files in the highest quality you have, plus any brand colors or fonts.
- A list of every service you offer and every city or area you serve.
- Photos of your team, your work and your location. Phone photos taken in good light are fine.
- Three or four competitor or inspiration sites, with a note on what you like about each.
- Your best reviews and any certifications, awards or memberships worth showing.
The First 30 Days After Launch
Launch day is not the finish line. The first month is when small problems show up and get fixed:
- Watch Search Console for crawl errors and pages Google cannot index.
- Check that every redirect from the old site lands on the right page.
- Confirm form submissions and calls are being tracked, and that leads reach the right inbox.
- Collect feedback from customers and staff who use the site.
Rankings often wobble for a few weeks after any launch while Google re-crawls the site. That is normal; a steady decline after a month is not, and is worth investigating right away.
How to Plan a Launch Date
Work backward from when you need the site, then add two weeks of buffer. If you have a seasonal rush, launch before it, not during it. The Christmas tree farm in our Ergle case study went live just before opening week, which is why it was ready when the searches came.
People Also Ask
How long does it take to build a small business website?
Most small business websites take four to six weeks from kickoff to launch. Simple five-page sites can be faster, and larger multi-location sites take seven to ten weeks.
What is the longest part of building a website?
Content. Writing copy and gathering photos takes longer than design or development on most projects, especially when the business owner is writing it.
Can a website be built in a week?
A very simple site can be, but a site that needs to rank and convert needs time for planning, content, testing and launch setup. Rushed launches often skip testing and redirects.
How long does a website redesign take?
Usually the same four to ten weeks as a new build, plus a few days to map old URLs to new pages so rankings carry over.